The step by step process to building a granny flat .

 

When a house is starting to feel a little cramped, the backyard is the logical place to seek some extra space.

But while “building out the back” is popular across the country, it requires research and planning, according to Simon Croft, executive director of building policy at the Housing Industry Association (HIA).

Croft says homeowners often ask HIA members for advice about building a granny flat, studio, teenage retreat or other structure “out the back” of a . He says checking what is and isn’t allowed is the vital first step.

backyard studio

First, check to see if you’re allowed to build out the back. Picture: Archiblox

“Check the rules and regulations regarding granny flats, which are also sometimes referred to as secondary or ancillary dwellings, for the local area. Call the local council or state building or planning department to check what the rules are,” he says.

“Advice could also be sought from an architect, draftsmen or building certifier/ who works in the area, or one that may offer specialised consultation services or specialise in granny flat designs and approvals.”

Here’s how to get the most out of your architect.

Croft says the amount of land available influences what can be built on it.

“The main criteria around whether someone can or can’t build a granny flat on their land comes down to the size of land. There may also be conditions on whether the granny flat can be rented out or only occupied by family members,” he says.

Croft says homeowners should find out if the land is affected by constraints such as easements, setbacks from the main dwelling or neighbouring properties or planning overlays. Access and car parking also needs to be taken into consideration.

29 Baird Ave, Matraville, NSW.

The amount of land available influences what can be built on it. Picture: realestate.com.au/

Croft says owners need to also think about:

  • What materials will be used, in particular roofing and cladding, as they may need to be consistent with the primary dwelling for visual reasons
  • Potential overlooking issues
  • Internal layouts and room sizes

“It’s good to do your research up front,” Croft says.

Regulations prescribe a minimum land size and maximum size of a granny flat, Croft says. For example, in New South Wales, the minimum land size required is 450sqm and the maximum granny flat size is 60m2. These requirements vary from state to state.

granny flat tiny home

Regulations prescribe a minimum land size and maximum size of a granny flat. Picture: Granny Flat Specialists

“Where the requirements allow a granny flat, you may be exempt from getting some permits that would apply to building a house, but you will still need to have plans drawn up and obtain a permit for the work, which could be issued by the local council or a private building certifier/surveyor. This does vary, so again you are best to check,” Croft says.

Next, call in the professionals. “In terms of building the granny flat, this will need to be done by a registered and licensed builder and the design and construction will need to comply with the building code and relevant standards,” he says.

“Choosing a builder that belongs to an industry association such as the HIA ensures you are choosing someone who belongs to a professional association, which has members’ codes of ethics, provides education and training for members and promotes the notion of members being leaders in their industry,” Croft says.

engaging a builder

Choose a builder that belongs to an industry association such as the HIA. Picture: Getty Images

Homeowners should ensure they get quotes from various builders and check referees, he says.

“As part of a builder signing on to do the work, there will need to be a contract in place, which is signed by both the owner and the builder,” Croft says.

“The contract is not only a legal requirement, it is important as it clearly spells out the agreed cost of the project, progress payments and so on, which is essential to the process, as both parties are clear from the outset what is included and what is not included in the contract works.”

A specification list, which itemises all the fittings, fixtures and any extras to be incorporated in the building, is also useful, he adds.