{"id":7232,"date":"2017-11-27T02:15:55","date_gmt":"2017-11-27T02:15:55","guid":{"rendered":"https:\/\/amazingproperty.com.ng\/blog\/developer-targets-june-for-18-floor-tower\/"},"modified":"2017-11-27T02:15:55","modified_gmt":"2017-11-27T02:15:55","slug":"developer-targets-june-for-18-floor-tower","status":"publish","type":"post","link":"https:\/\/amazingproperty.com.ng\/blog\/developer-targets-june-for-18-floor-tower\/","title":{"rendered":"Developer targets June for 18-floor tower"},"content":{"rendered":"<p>\n<\/p>\n<div readability=\"43.638083228247\">\n<article data-post-type=\"post\" data-post-id=\"479866\" readability=\"31\">\n<div id=\"attachment_479876\" class=\"wp-caption alignleft\" readability=\"32\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower.jpg?resize=1270%2C716&#038;ssl=1\" data-lazy-src=\"https:\/\/i0.wp.com\/guardian.ng\/wp-content\/plugins\/ventra-lazy-load\/images\/1x1.trans.gif?ssl=1\" data-lazy-srcset=\"https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower.jpg 1270w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-640x361.jpg 640w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-1062x598.jpg 1062w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-320x180.jpg 320w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-281x158.jpg 281w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-562x316.jpg 562w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-531x299.jpg 531w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-487x275.jpg 487w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-974x549.jpg 974w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-600x338.jpg 600w\" alt=\"\" width=\"1270\" height=\"716\" class=\"size-full wp-image-479876 lazyload\" sizes=\"auto, (max-width: 1270px) 100vw, 1270px\"\/><noscript><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower.jpg?resize=1270%2C716&#038;ssl=1\" alt=\"\" width=\"1270\" height=\"716\" class=\"size-full wp-image-479876 lazyload\" srcset=\"https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower.jpg 1270w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-640x361.jpg 640w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-1062x598.jpg 1062w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-320x180.jpg 320w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-281x158.jpg 281w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-562x316.jpg 562w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-531x299.jpg 531w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-487x275.jpg 487w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-974x549.jpg 974w,https:\/\/guardian.ng\/wp-content\/uploads\/2017\/11\/Greystone-Tower-600x338.jpg 600w\" sizes=\"auto, (max-width: 1270px) 100vw, 1270px\"\/><\/noscript><\/p>\n<p class=\"wp-caption-text\">The on-going construction at the Greystone Tower in Lagos<\/p>\n<\/div>\n<p>Lagos-based <a href=\"https:\/\/amazingproperty.com.ng\/blog\/property-center-nigeria\/\">real estate<\/a> firm, Fine and Country International Realty has kicked off an 18-floor mixed use development that will expand the options for corporate tenants in Victoria Island, Lagos.<\/p>\n<p>The new development christened Greystone Tower is expected to cushion the existing deficits in office and residential demands in Victoria Island axis of Lagos State by June 2018. The project, a one-unit tower occupies a total land area of 2,031square metres and located at the intersection of Idowu Taylor and engineering close and has a total of 18 floors. <\/p>\n<p>The first five floors (Ground Floor \u2013 fifth floor) are dedicated to parking. Each parking floor is further split into two, thus, providing sufficient parking for a maximum of 180 cars. The sixth floor is the \u201cconcessionary floor\u201d where there are restaurant, caf\u00e9\/coffee shop and the gym.<\/p>\n<p>\u00a0\u00a0<br \/>Handled by DORI construction and funded through equity, the edifice is presently at its finishing stage while it is expected is to be delivered by June 2018.<br \/>\u00a0\u00a0\u00a0<br \/>Giving details on the development, a senior officer of the company in charge of commercial sales, Mr. David Mbah said, \u201cthe project is a mixed use development with 10 floors of office space, five floor of parking and two rooms of residential development. The office space starts from the seventh floor and terminates on the 16th floor (10 floors of offices). \u00a0The 16th floor is also known as the \u201cExecutive floor\u201d. The 17th floor is dedicated to the executive apartments, which comprises; four units of three bedroom apartments (all en-suite) with the following sizes; 172m2, 188m2, 231m2 and 224m2\u201d.<br \/>\u00a0\u00a0\u00a0<br \/>He said: \u201cThe last two apartments have terraces measuring 78m2 each respectively. In addition, there are two endless pools provided at the deck of the 17th floor for the apartments. The 18th floor is the helipad. The building has fIve lifts, consisting of four passenger lifts and a goods lift. Each office floor has \u2013 two server rooms and six restrooms (including twodisabled restrooms). \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<p>The building has raised floor and suspended ceilings. The floor sizes are typical with a Gross Leasable Area (GLA) of 1,119m2 and Net Leasable Area (NLA) of 923m2.There is an outdoor terrace\/ lounge on each office floor. \u00a0There is also a Driver\u2019s Lounge provided\u201d.<br \/>\u00a0 \u00a0<br \/>According to him, the company adopted a competitive bidding process to select the best construction company and building experts that could deliver best and quality work for prospective subscribers. She stated that already five firms have subscribed to the project<br \/>\u00a0<br \/>Mba further stated that some of the unique facilities in the project include, the raised floors, modern technology, <a href=\"https:\/\/amazingproperty.com.ng\/blog\/the-benefits-of-solar-roofing-for-your-home\/\">energy<\/a> and resource conservation features, mixed-use (residential apartments are available), recreational facilities (gymnasium), helipad, and generous space, amongst others.\u201cMost of the materials are sourced from Europe to raise the quality of prime office spaces in Nigeria,\u201d he added.<\/p>\n<\/article>\n<p>\t\t\t<br class=\"clear\"\/><br \/>\n\t\t\t<br class=\"clear\"\/><\/p><\/div>\n<p><a hre=\"http:\/\/guardian.ng\/property\/developer-targets-june-for-18-floor-tower\/\"> Guardian <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The on-going construction at the Greystone Tower in Lagos Lagos-based real estate firm, Fine and Country &hellip; <a title=\"Developer targets June for 18-floor tower\" class=\"hm-read-more\" href=\"https:\/\/amazingproperty.com.ng\/blog\/developer-targets-june-for-18-floor-tower\/\"><span class=\"screen-reader-text\">Developer targets June for 18-floor tower<\/span>Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":7233,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[4],"tags":[2890,523,1399,3123,684,522,41,818,84,15282,15296,907,3053],"class_list":["post-7232","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-opportunities-in-new-markets","tag-construction","tag-country","tag-development","tag-engineering","tag-lagos","tag-nigeria","tag-property","tag-real","tag-real-estate","tag-ross","tag-target","tag-tenant","tag-tenants"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/amazingproperty.com.ng\/blog\/wp-content\/uploads\/2017\/11\/Greystone-Tower.jpg?fit=1270%2C716&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/posts\/7232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/comments?post=7232"}],"version-history":[{"count":0,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/posts\/7232\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/media\/7233"}],"wp:attachment":[{"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/media?parent=7232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/categories?post=7232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/amazingproperty.com.ng\/blog\/wp-json\/wp\/v2\/tags?post=7232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}